Q1:
What is the cycle time?

○
A
5 minutes○
B
17 minutes○
C
14 minutes○
D
6 minutes
AACE International
AACE-PSP
Q2:
What problems can a soils engineer deal with on a project?
○
A
Survey error.○
B
Hidden subsurface conditions.○
C
Archeological findings.○
D
Toxic soils.
AACE International
AACE-PSP
Q3:
What owner action could have mitigated the late completion of the project?
○
A
Hire a more senior project manager.○
B
Self-perform more of the work.○
C
Use a procurement agent to monitor and expedite equipment deliveries.○
D
Prepare better structural steel drawings.
AACE International
AACE-PSP
Q4:
For which of these delays should an owner grant a time extension?
○
A
Structural steel shop drawings.○
B
Shop drawings and centrifuge delay.○
C
Differing site conditions at parking structure.○
D
Differing site conditions and centrifuge delay.
AACE International
AACE-PSP
Q5:
Identify the minimum project duration.

○
A
20 months.○
B
16 months.○
C
19 months.○
D
21 months.