Available Number of Questions: Maximum of
57 Questions
Exam Name: Autodesk Certified Professional in BIM Management for Building Design
Exam Duration: 120 Minutes
Related Certification(s):
AutoDesk AEC Certification
AutoDesk BIM_MGT_101 Exam Topics - You’ll Be Tested in Actual Exam
You will be judged less on fancy modeling moves and more on whether you can keep a building project from drifting into chaos when many people touch the same information. The exam keeps circling back to the collaboration process because that is where small choices turn into big problems, like unclear handoffs, mismatched expectations, or teams working from stale files. It assumes you can read a project needs assessment and turn it into workable rules for how the team will produce, share, review, and approve model based information. That then ties directly into corporate standards and documentation, since your job is to align project demands with how an organization names, structures, and records work so that deliverables are recognizable and traceable. Data management sits underneath all of it. If you cannot control what data is created, where it lives, who edits it, and how it is versioned, the rest becomes theater. Candidates often trip up by treating standards as paperwork instead of decision making, or by focusing on what they prefer instead of what the project actually needs. Expect scenarios where you must choose the next best step when requirements conflict, or when documentation and data flow are out of sync. If you practice translating needs into specific collaboration rules and then checking whether the data trail supports those rules, you will think the way the exam wants you to think.
AutoDesk BIM_MGT_101 Exam Short Quiz
Attempt this AutoDesk BIM_MGT_101 exam quiz to self-assess your preparation for the actual AutoDesk Autodesk Certified Professional in BIM Management for Building Design exam. CertBoosters also provides premium AutoDesk BIM_MGT_101 exam questions to pass the AutoDesk Autodesk Certified Professional in BIM Management for Building Design exam in the shortest possible time. Be sure to try our free practice exam software for the AutoDesk BIM_MGT_101 exam.
1of 0 questions |
AutoDesk BIM_MGT_101 Exam Quiz
✓ 0 answered
🔖 0 bookmarked
AutoDeskBIM_MGT_101
Q1:
A BIM manager is running clash detection for the first time on a large retail project during the Design Development phase. After copying all the models to the coordination space on Autodesk Forma, the matrix shows no clashes among any of the models.
How should the BIM manager proceed?
○
AAdd sheets to the publish settings and rerun the clash.
○
BVerify the shared coordinates for each model and republish.
○
CContinue forward on the project because there are no coordination issues.
○
DUse the project as a case study for a firm-wide presentation.
AutoDeskBIM_MGT_101
Q2:
Refer to the exhibits.
The firm's technical group would like to show demolished elements as dashed red in all future projects. The BIM manager is updating the Revit template to meet this new standard.
Which Phase Graphic Override will accomplish this?
○
AExhibit 4
○
BExhibit 2
○
CExhibit 1
○
DExhibit 3
AutoDeskBIM_MGT_101
Q3:
Refer to the exhibit.
A client has provided the design team with a title block family and a Shared Parameters file that must be used as part of their standards. Those provided parameters must be applied both in the Project Information area as well as the title block.
When the design team is in the project model and attempts to fill in information into the title block parameters, a question mark appears. What is the likely cause of this?
○
AThe shared parameters were included in the title block family but were not loaded into the project file.
○
BThe parameters were not included in the Shared Parameters file provided by the client.
○
CThe Shared Parameters file was not added to the title block family and was using text instead of a label.
○
DThe Sheet and Project Information fields were overwritten in the title block.
AutoDeskBIM_MGT_101
Q4:
A Revit model in Autodesk Forma that does not have any consultant links is opening for all team members except one. The project BIM manager has already audited and compacted the model.
What should the BIM manager do so that the team member can open the model?
○
AClear the user's collaboration cache files and retry again.
○
BAgree to a user request for a hardware upgrade.
○
CRoll back the model to a previous version.
○
DPublish the model to Autodesk Forma and ask the user to retry again.
AutoDeskBIM_MGT_101
Q5:
A regional user group raised awareness about a third-party add-on tool that enables a team to establish thresholds for model warnings. In addition, it automates suppressing warnings deemed negligible to a specific project.
Which two data points should a BIM manager gather to build a business case to have the tool approved for use across the firm? (Select two.)
☐
AThe cost per user multiplied by the number of entire office staff, including the cost of time to implement and train on the tool.
☐
BHow many of the firm's competitors are already using the tool.
☐
CThe language that available training materials on the tool are in.
☐
DThe reliability of the tool creator and the time to install, test, and create training materials on the tool.
☐
EThe relevant user group, the projected cost to supply the group, and the anticipated time savings and/or risk mitigation that the tool would provide.