Cisco
700-821
Q1:
Which two IoT routers or gateways are used when a customer requests two active LTE connections? (Choose two.)
☐
A
IG21 gateway☐
B
IR1101 without expansion module☐
C
IR1101 with expansion module and cellular modules☐
D
IR1831 with dual cellular modules☐
E
IR1821 with dual cellular modules
Cisco
700-821
Q2:
Which hardware capability do industrial Ethernet (IE) switches have that Enterprise switches do not have?
○
A
include a built-in battery○
B
industrial ruggedization so the switch can operate in harsh environments○
C
additional fans so the switch can be deployed in high-temperature environments○
D
support for higher ethernet port density
Cisco
700-821
Q3:
How is the Cisco IoT Operations Dashboard deployed?
○
A
embedded inside the IOS of each industrial Router (IR) and Industrial Ethernet Switch (IE)○
B
delivered as an OVA and has to be installed on a Windows server○
C
SaaS offering hosted in the cloud○
D
delivered as a 3 Rack Unit (RU) appliance that has to be installed in the data center
Cisco
700-821
Q4:
Which management tool is ideal for green field installations using IE switches?
○
A
DNA-Center○
B
Solar Winds○
C
IE Device Manager○
D
Prime Infrastructure
Cisco
700-821
Q5:
As a Tri-Radio architecture, which three frequencies are supported on IW9167E? (Choose three.)
☐
A
2.4GHz☐
B
6GHz☐
C
1GHz☐
D
160MHz☐
E
900MHz☐
F
5GHz