Hitachi Vantara
HQT-4420
Q1:
Your customer has tested a new HCP G10 with an S10 node and they now want to re-install the S10 node before turning it into production.
What are three requirements? (Choose three.)
☐
A
The S10 node must be retired in the HCP G10 System Management Console☐
B
The S10 node must be disconnected from the HCP G10 cluster☐
C
The S10 node must boot the installation package from the USB drive☐
D
The Genesis build must be manually started on the S10 node☐
E
The first-time setup wizard must be completed on the S10 node
Hitachi Vantara
HQT-4420
Q2:
How should the RAID group(s) and logical volume(s) be configured on an HCP G10 node with six internal drives?
○
A
a single RAID group with a single logical volume○
B
a single RAID group with three logical volumes.○
C
three RAID groups each with a single logical volume○
D
three RAID groups each with three logical volumes
Hitachi Vantara
HQT-4420
Q3:
A customer is using a four-node HCP G10 cluster and they would like to upgrade to eight nodes.
Which two node models can be used to upgrade the cluster? (Choose two.)
☐
A
Compute Rack 210H☐
B
G10☐
C
G11☐
D
S10
Hitachi Vantara
HQT-4420
Q4:
You need to convert the installation media ISO image to a bootable USB drive.
Which tool from the "HCP-G10-Tools" package should you use?
○
A
Bootflash○
B
Flashwrite64○
C
Rawflash○
D
Rawrite32
Hitachi Vantara
HQT-4420
Q5:
What does the HCP Data Protection Level setting identify?
○
A
the number of copies of object metadata to be maintained by the system○
B
the RAID type used to store object metadata in the system○
C
the RAID type used to store an object in the system○
D
the number of copies of an object to be maintained by the system