Available Number of Questions: Maximum of
60 Questions
Exam Name: Aruba Certified Switching Expert Written Exam
Exam Duration: 90 Minutes
Related Certification(s):
HP ACSX Certification
HP HPE6-A69 Exam Topics - You’ll Be Tested in Actual Exam
What surprises people is how quickly this exam moves from a clean design idea to messy switch behavior you have to explain in plain terms. You are expected to think like the person who owns the wired network end to end, starting with planning choices that actually constrain everything later, like how you lay out VLANs, trunks, and redundancy so the network can be built without odd exceptions. Then it gets hands on fast, because install and configuration is not about memorizing commands but about reading intent from a scenario and choosing settings that fit together, especially around Layer 2 and Layer 3 boundaries, uplinks, and access edge details. Troubleshooting is where the exam feels most opinionated. You need to reason from symptoms to likely causes, isolate the fault domain, and pick the next check that would change your confidence, rather than guessing a fix. Candidates get tripped up when they treat monitoring and management as an afterthought, because you are also tested on whether you can keep visibility on what you built and interpret what the network is telling you over time. If you study, practice telling a coherent story from plan to config to fault isolation, and be ready to justify why your next step is the right one.
HP HPE6-A69 Exam Short Quiz
Attempt this HP HPE6-A69 exam quiz to self-assess your preparation for the actual HP Aruba Certified Switching Expert Written Exam . CertBoosters also provides premium HP HPE6-A69 exam questions to pass the HP Aruba Certified Switching Expert Written Exam in the shortest possible time. Be sure to try our free practice exam software for the HP HPE6-A69 exam.
1of 0 questions |
HP HPE6-A69 Exam Quiz
✓ 0 answered
🔖 0 bookmarked
HPHPE6-A69
Q1:
A customer wants to verify the proposed configuration snippets to create a point-to-point link between Aruba Switch and a third-party switch.
Will this configuration work with static routing?
○
ANo, the configuration will not work, because the Aruba Switch has an MTU mismatch which will prevent IP communication.
○
BNo. the configuration will not work, because the Aruba Switch does not have a locally reachable IP address from the third-party switch.
○
CNo. the configuration will not work because the Aruba Switch does not have the 'routing' command on it
○
Dyes, the configuration should work fine and has no issues
HPHPE6-A69
Q2:
With the given topology, the customer Has ArubaOS-CX 6300 switches and Aruba Gateway in use.
What is required for the client traffic to be tunneled as per best practice between the connected switch port and the Aruba Gateway'' (Select two.)
☐
AIP Protocol 6 should not be blocked on me datapath
☐
BIP Protocol 47 should not be blocked in the data-path
☐
CThe ArubaOS-CX switch and Aruba gateway should have an end-to-end MacSec connection
☐
DThe ArubaOS-CX switch and Aruba gateway should be EBGP peers.
☐
EChange the default MTU on the data-path between the switch and gateway
HPHPE6-A69
Q3:
What are two valid steps in a Proof of Concept plan? (Select two)
☐
ADevelopment of the items to Be tested
☐
BEngineering a proposed solution
☐
CDefinition of success criteria
☐
DAcceptance of the proposed solution
HPHPE6-A69
Q4:
With the given access-list:
Which statement is true about hardware resource consumption of this ACL?
○
AThe ACL consumes a total of 2 entries
○
BThe ACL consumes a total of 4 entries.
○
CThe ACL consumes a total of 6 entries.
○
DThe ACL consumes a total of 8 entries.
HPHPE6-A69
Q5:
You need to establish a baseline summary of an ArubaOS-CX switch resource utilization after enabling new NAE scripts. How should you define a baseline for switch resource consumption? (Select two.)