Available Number of Questions: Maximum of
40 Questions
Exam Name: SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Exam Duration: 150 Minutes
Related Certification(s):
SAP Certified Specialist, SAP Certifications
SAP E_S4CON_2505 Exam Topics - You’ll Be Tested in Actual Exam
The SAP E_S4CON_2505 exam is a comprehensive assessment designed to evaluate your expertise in implementing and configuring SAP S/4HANA Cloud for the professional services industry. This exam covers a wide range of topics, providing a deep understanding of the system's capabilities and best practices. You'll delve into the configuration process, learning how to tailor the system to meet specific business needs. Master data management is a crucial aspect, ensuring accurate and consistent data across various modules. Understanding the integration of SAP S/4HANA Cloud with other SAP solutions is essential for seamless operations. The exam also explores project management within the SAP environment, emphasizing efficient planning and execution. Additionally, you'll explore the role of SAP Fiori apps in enhancing user experience and productivity. Security and compliance considerations are vital, ensuring data protection and adherence to industry standards. Finally, you'll gain insights into the benefits and challenges of adopting SAP S/4HANA Cloud, preparing you to implement the system successfully in real-world scenarios.
SAP E_S4CON_2505 Exam Short Quiz
Attempt this SAP E_S4CON_2505 exam quiz to self-assess your preparation for the actual SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade exam. CertBoosters also provides premium SAP E_S4CON_2505 exam questions to pass the SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade exam in the shortest possible time. Be sure to try our free practice exam software for the SAP E_S4CON_2505 exam.
1of 0 questions |
SAP E_S4CON_2505 Exam Quiz
✓ 0 answered
🔖 0 bookmarked
SAPE_S4CON_2505
Q1:
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answe rs to this question.
☐
AIt contains a section about the simplification item (SI) checks.
☐
BIt explains the database migration option (DMO) of SUM.
☐
CIt is a database-specific document.
☐
DIt explains where to find information about the custom code analysis.
SAPE_S4CON_2505
Q2:
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note: There are 2 correct answe rs to this question.
☐
ACheck the dump size of the database export on disk.
☐
BCheck the log files written in the SUM directory, subdirectory abap, subdirectory log.
☐
CCheck logs for jobs starting with RSUPG_SGEN in the SAP system.
☐
DCheck the Charts Control Center in the SUM UI.
SAPE_S4CON_2505
Q3:
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel. Why are 40 Process Buckets executed in parallel?
○
AThese are 40 pairs of R3load processes, so there are 80 R3load processes running.
○
BThere is a maximum of 40 parallel R3load processes within this specific phase.
○
CSUM is still running in uptime; the 40 defined R3load processes are considered.
○
DThe number of CPU cores does NOT allow more than 40 R3load processes to be run in parallel.
SAPE_S4CON_2505
Q4:
Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answe rs to this question.
☐
AUninstall industry extensions NOT supported by SAP S/4HANA.
☐
BDelete client 066 (Early-Watch client).
☐
CUninstall Fiori apps NOT released for SAP_UI 7.50.
☐
DInstall add-on SAP Gateway 7.50.
SAPE_S4CON_2505
Q5:
During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAU. There you find programs that are shown in status "automatic adjustment" (green traffic light). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
○
ASUM continues with the next phase and your modifications are kept as in the start release.
○
BSUM refuses to continue unless you have marked a transport request as modification adjustment transport.
○
CSUM continues with the next phase, and your modified objects are set to the new SAP standard.
○
DBefore continuing with the next phase, SUM asks for a modification adjustment transport.